Sulfur Recovery Experience

Unit Type(s) Capacity Location Project Involvement
       
Claus SRU, SCOT Tail Gas Cleanup Unit 10 LTPD California bid package, bid evaluation, lead process design process design package*, and contractor work review
       
Recycle Selectox SRU, Retrofit of Existing SRU 25 LTPD Texas process/project engineering, equipment selection, and detailed mechanical design
       
Claus SRU, SCOT Tail Gas Cleanup Unit, and Sulfur Pipeline/Loading 394 LTPD Alabama detailed feasibility study: heat and material balance, process and mechanical flow sheets, utility summary, and cost estimate
       
Claus SRU 36 LTPD Canada project proposal
       
Claus SRU 125 LTPD Spain project proposal
       
Recycle Selectox SRU 30 LTPD Oklahoma project management, conceptual process design, bid request, contractor selection, construction checkout, and startup
       
Claus SRU 5 LTPD Arkansas construction checkout, startup, facility modifications, and regulatory compliance
       
       
Claus SRU 214 LTPD Wyoming technology selection and conceptual process design, environmental permitting, bid request, contractor selection, and contractor design monitoring
       
Claus SRU/MCRC 22 LTPD Michigan technology selection and conceptual process design, environmental permitting, and regulatory assistance
       
Claus SRU/CBA 7 LTPD Texas technology selection, bid request, contractor selection, and project management

 

Copyright 2002, The Arrington Corporation


* Process Design Package consists of heat and material balance, process flow sheets, piping and instrument diagrams, plot plan, equipment specifications, instrument list and process specifications, line list and specifications, and utility summary.